• About Us
  • Privacy Policy
  • Contact Us
  • Advertise With Us
  • Home
Metrowatchonline
Sunday, March 1, 2026
  • Home
  • News
  • Security
  • World
No Result
View All Result
  • Home
  • News
  • Security
  • World
No Result
View All Result
Metrowatchonline
No Result
View All Result
Home Business

SNEPCo Begins Turnaround Maintenance at Bonga to Extend Asset Life

The last turnaround maintenance activity on the FPSO took place in October 2022. On February 1 the following year, the asset delivered its 1 billionth barrel of oil since production commenced in 2005.

Isioma Ogochukwu by Isioma Ogochukwu
February 2, 2026
in Business, Highlights, News, POLITICS
0
SNEPCo Begins Turnaround Maintenance at Bonga to Extend Asset Life

*Bonga Floating Production Storage and Offloading (FPSO)

By Ogochukwu Isioma

Shell Nigeria Exploration and Production Company Limited (SNEPCo) has commenced a turnaround maintenance activity at the Bonga Floating Production Storage and Offloading (FPSO) vessel. The exercise is a statutory and integrity assurance programme aimed at extending the life of the facility.

“The schedule maintenance activity is designed to ensure the FPSO continues to operate safely and efficiently for the next 15 years, while reducing unplanned deferments and strengthening the asset’s overall resilience,” said SNEPCo Managing Director, Ronald Adams. “We expect to resume operations in March following the completion of the turnaround.”

The scope of work includes statutory inspections, certification and regulatory compliance checks, major asset -integrity upgrades as well as engineering modifications to improve long-term operations and subsea assurance activities.

ALSO READ...

Iran Confirms Killing of Supreme Leader Khamenei in US-Israeli Airstrikes

OGUN 2027 | I’m Not in Guber Race to Step Down, Iyabo Obasanjo Tells Critics

The FPSO located approximately 120 km offshore in water depths exceeding 1,000 meters, has the capacity to produce 225,000 barrels of oil and 150 million standard cubic feet of gas per day. Maintaining the integrity of this critical national asset is essential to supporting stable production and Nigeria’s wider energy, security and revenue objectives.

This year’s turnaround comes at a strategic moment for SNEPCo and its co‑venture partners. In 2024, the partners took Final Investment Decision on Bonga North, a subsea tie‑back development that will depend on the reliability and enhanced capacity of the Bonga FPSO. A successful turnaround maintenance is therefore essential to preparing the facility for the additional volumes and operational demands associated with the new development.

The last turnaround maintenance activity on the FPSO took place in October 2022. On February 1 the following year, the asset delivered its 1 billionth barrel of oil since production commenced in 2005.

SNEPCo operates the Bonga field in partnership with Esso Exploration and Production Nigeria (Deepwater) Limited and Nigerian Agip Exploration Limited, under a Production Sharing Contract with the Nigerian National Petroleum Company Limited (NNPC Ltd)

Previous Post

Davido Misses Out on Grammy as Tyla Wins Award

Next Post

Failed Coup: I Was Meant to Be Shot, Says Defence minster

Isioma Ogochukwu

Isioma Ogochukwu

Ogochukwu Isioma is a Bachelor's degree holder in Linguistics (Hons) from the University of Benin, and a Master's student in International Affairs and Diplomacy at the Amadu Bello University, Zaria. With over half a decade-long active journalism practice, Ogochukwu is the Founder and Publisher of popular education-focused online medium, CAMPUS GIST, and currently writes for METROWATCH. He can be reached via ogochukwuisioma@gmail.com.

Related Posts

Iran Confirms Killing of Supreme Leader Khamenei in US-Israeli Airstrikes

Iran Confirms Killing of Supreme Leader Khamenei in US-Israeli Airstrikes

March 1, 2026
Iyabo Obasanjo

OGUN 2027 | I’m Not in Guber Race to Step Down, Iyabo Obasanjo Tells Critics

March 1, 2026
Trump

Our Goal is to End Decades-long Threat from Iran, Says Trump

March 1, 2026
Netanyahu Says There Are Signs Khamenei is Dead

Netanyahu Says There Are Signs Khamenei is Dead

February 28, 2026
BREAKING | Iran’s Supreme Leader Khamenei Killed in U.S./Israel Airstrike

BREAKING | Iran’s Supreme Leader Khamenei Killed in U.S./Israel Airstrike

February 28, 2026
Canada

War: Canada Backs US, Israel on Military Action against Iran

February 28, 2026
Next Post
Musa

Failed Coup: I Was Meant to Be Shot, Says Defence minster

  • About Us
  • Privacy Policy
  • Contact Us
  • Advertise With Us
  • Home

© 2026 Metrowatch Online Published by Miraculous Media Connect Limited. All rights reserved

No Result
View All Result
  • Home
  • News
  • Security
  • World

© 2026 Metrowatch Online Published by Miraculous Media Connect Limited. All rights reserved

Go to mobile version