• About Us
  • Privacy Policy
  • Contact Us
  • Advertise With Us
  • Home
Metrowatchonline
Sunday, August 2, 2026
  • Home
  • News
  • Security
  • World
No Result
View All Result
  • Home
  • News
  • Security
  • World
No Result
View All Result
Metrowatchonline
No Result
View All Result
Home Arms Of Govt.

2nd Niger Bridge: Nigerian Government Saves N300Bn from New Design, Says Dave Umahi | METROWATCH

Emmanuel Babs by Emmanuel Babs
March 25, 2024
in Arms Of Govt., Business, Highlights, Top News
0
Umahi

*Dave Umahi

By Angela Atabo

The Minister of Works, David Umahi, has said that the new design of the Ontisha axis of the second Niger bridge has saved the nation up to N300 billion.

Umahi disclosed this in Asaba, Delta State, when he led the management of the ministry on an inspection tour of the bypass to the bridge down to Onitsha.

A statement on the tour issued by Mr Orji Orji, the minister’s Special Adviser on Media, was made available to newsmen on Monday in Abuja.

ALSO READ...

REPOSTE | Cardinal Onaiyekan’s Abuse of Clerical Privilege, By Temitope Ajayi

Elon Musk Says Nigeria Recorded 4 Million More Births than EU

According to Orji, the minister said: “We saw that the design was defective and we agreed on a new kind of design.

“That was how we saved the country over N300 billion by that singular movement to that location.

Orji said other projects’ sites visited by the minister included the upgrading of the 15km section of the East-West road section III, Port Harcourt – Eleme Junction to Onne Junction in Rivers, being handled by RCC.

He said the minister also inspected the Enugu- Port Harcourt expressway section 3 under rehabilitation, the Enugu- Lokpanta being handled by CGC and the rehabilitation work at the collapsed bridge site at the New Artisan Bridge, near Enugu state.

He said the minister expressed satisfaction with the jobs being done and charged contractors to step up their pace to cover a milestone ahead of the rainy season.

Orji said the minister disclosed that the federal government was upgrading the 15km road between Eleme flyover and Onne junction and starting with excavation to fill all the failed sections to make them stable.

According to him, the minister expressed the federal government’s commitment to building enduring road infrastructure at lowest possible cost.

He urged the contractors to always consider the sufferings of the road users as they set up their work plans.

Umahi also urged them to ensure that the roads under construction were made passable for commuters during the rainy season.(NAN)

Tags: Dave UmahiDeltaMr Orji OrjiNigerian Government
Previous Post

Nigerian Government: Sheikh Gumi Not Above the Law, Being Questioned over Kidnappings | METROWATCH

Next Post

OPINION | The Morality Question, By Dakuku Peterside | METROWATCH 

Emmanuel Babs

Emmanuel Babs

Related Posts

Oborevwori

Oborevwori to Receive, Present Support to Repatriated Deltans from South Africa

July 31, 2026
Delta

2027: Delta Central APC Endorses Tinubu, Oborevwori, Other Candidates

July 26, 2026
Sowore

Mary Habila: Umahi Must be Arrested, Investigated, Sacked, Says Sowore

July 20, 2026
Oborevwori Unveils Digital Advertising Platform to Boost Delta Revenue

Oborevwori Unveils Digital Advertising Platform to Boost Delta Revenue

July 18, 2026
Umahi

Umahi: ‘I’m Deeply Pained by Mary’s Death’

July 17, 2026
VIO Officer Crushed to Death after Climbing Moving Truck in Delta

VIO Officer Crushed to Death after Climbing Moving Truck in Delta

July 16, 2026
Next Post
OPINION | The Morality Question, By Dakuku Peterside | METROWATCH 

OPINION | The Morality Question, By Dakuku Peterside | METROWATCH 

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

  • About Us
  • Privacy Policy
  • Contact Us
  • Advertise With Us
  • Home

© 2026 Metrowatch Online Published by Miraculous Media Connect Limited. All rights reserved

No Result
View All Result
  • Home
  • News
  • Security
  • World

© 2026 Metrowatch Online Published by Miraculous Media Connect Limited. All rights reserved

Go to mobile version